Cotec Receive New 9 Bay Clearview Modular

Client:
Cotec Ordnance Test Centre, Cranfield University
Project:
Clearview 9 bay modular office complex
Facilities:
Multiple offices, meeting and conference room, toilets, stores and welfare area

Mike and Martin, I wanted to take this opportunity, now our offices are complete, to thank you for all of your support and assistance in getting the building in and finished to such a high standard and in such a short time. I especially wanted to ask you to thank Steve and Phil for all their hard work and long hours - never without a smile on their faces! We are extremely pleased with what we now have; it's even more of a pleasure to come to work. At the start of the project, we were all very impressed with the way you handled the crane and module logistics - I've never seen such a dynamic production line. Furthermore, having all the units down in one day was even more impressive. I would thoroughly recommend the JackPads! Once again, very many thanks. Please find a couple of pictures, with a couple more to follow.

Eric Palmer, 'Director of Operations,Cranfield Test and Evaluation Centre'

The Cranfield Ordnance Test and Evaluation Centre is a nationally important explosives testing facility, with the highest levels of Health and Safety and an expert eye for safe working. It is therefore really pleasing for us to have received such a wonderful testimonial from their Director of Operations, Eric Palmer. The company is obviously delighted with our products, our staff and our experienced and professional installation team. We're sure "fireworks" would have ensued if our H & S protocols hadn't met their high standards - but actually we've received the highest praise from the people for whom safety is paramount!

Installation work commenced just after November 5th, when Cotec fulfilled their "burning desire" to dismantle their old buildings in preparation for their stunning new modular accommodation. The prepared site was fitted with JackPad foundations, ready to receive the modules as they were delivered. As always, we delivered our building on time and on budget. These smart modern offices are supported by subsidiary document and cabinet stores, meeting and conference rooms, a staff welfare area and disabled and general usage toilets. The design included a covered corridor through to an existing building.

We've worked in close collaboration with Eric Palmer, Cotec's Director of Operations, during every stage of this order. As a result, the building corresponds to Cotec's exact specifications and requirements. The collective staff should now have all their accommodation needs satisfied, and we thank Eric Palmer for his professional expertise as well as his kind letter of thanks. It is always a pleasure when we can fine tune our buildings to supply exactly what a customer knows they want. Job done!